The national estimate is adjusted by your state's overall price level (BEA Regional Price Parities, 2022, U.S.=100). This is a cost-of-living proxy applied to the national paint house price — not a per-state paint house quote. Always get local quotes before buying.

$3,750–$7,500 1,500 sq ft · $2.5–$5/sq ft (2 coats acrylic) Source: BLS PPI — Paint and Coating Manufacturing (PCU325510325510)

Estimated cost breakdown — individual components may vary by region and supplier.

Exterior house painting runs $1.50 to $8.00 per square foot of paintable surface installed — most whole-house jobs land between $3,750 and $7,500, with a small single-story ranch at $2,500–$5,000 and a two-story colonial at $5,000–$9,000. Use the calculator above: enter wall area (not floor area — a 2,000 sq ft home has 1,200–2,200 sq ft of paintable surface), select stories and grade, and you have a number to take into any quote. Labor is 70–80% of the total.

Reference tool only. This calculator is for planning estimates, not a structural recommendation. Consult a licensed engineer and your local building department before finalizing any load-bearing design.
Compiled from 2 verified .gov sources · 50-state regional adjustment · Data verified 2026-06-10
Embed this calculator on your site — free
<script src="https://livedatacalc.com/embed.js" data-calc="paint-house-cost-calculator"></script>

Free on any website. No account needed. Browse all 17 calculators →

How painters actually calculate your paintable square footage

A painter measures the perimeter of the house, multiplies by average wall height, and subtracts a portion of window and door openings — then adds trim as its own linear-foot figure.

Most don't subtract openings fully, because the perimeter of every window still has to be cut in by brush; the trim around a window can cost more labor than the glass area saves.

The shortcut worth knowing: paintable surface is 1.6–2.0× the floor footprint on a single story and 1.8–2.2× on a two-story. If a quote implies a surface figure well outside that band, someone measured wrong or is quoting a different scope than you think.

Coverage on the can — typically 350–400 sq ft per gallon — is a smooth-surface lab number. Real spread rates run 250–300 on wood lap, and stucco or rough masonry can drop below 200 on the first coat.

Two coats over stucco can consume nearly three times the gallons the label math suggests, which is why stucco quotes carry a material premium that looks like padding but isn't.

The extras that show up after the crew arrives

Color changes are billed by zone. Each additional color break — body to trim to shutters to front door — adds $200–$500 because it means separate cut lines, separate equipment cleanout, and separate dry time.

A three-color scheme on a house that was previously one color is not the same job.

Access is the other surprise. Overgrown foundation shrubs, a steep grade behind the house, a deck or pool in the ladder path — each of these slows setup and often appears as an extras line. Cut the shrubs back yourself a week before the crew arrives; it's free and it removes the argument.

Rot found during scraping is the big one. A painter who opens a soft fascia board is not going to paint over it, and shouldn't. Repair on a section runs $500–$5,000+ depending on how far it traveled.

Ask before signing how discovered rot will be priced — time-and-materials at a stated rate, or a subcontractor referral — so the conversation happens before the surprise, not during it.

Exterior Paint Grade: Cost vs. Service Life

Installed cost per sq ft and repaint cycle by grade. Material prices from retail survey; labor from BLS OES 47-2141.

GradeInstalled $/sq ftRepaint CycleBest For
Builder-grade latex$1.50–$3.005–7 yearsRentals, pre-sale prep, sound surfaces
Premium acrylic$2.5–$510–12 yearsOwner-occupied homes; best cost-per-year
Elastomeric coating$4–$812–15 yearsStucco, masonry, and hairline-cracked block only

Why two houses the same size get quotes $4,000 apart

Square footage sets the floor, not the price. The gap between a $5,000 and $9,000 quote on identical paintable surfaces comes down to labor hours, and labor hours come down to what the painter has to fight.

Smooth vinyl is the baseline. Wood lap siding, shingle, or shake adds 30–50% labor because every course has an edge that needs a brush. Stucco drinks paint — expect 20–30% more material than the can suggests.

Masonry usually pushes you into elastomeric, a different product category entirely — $4–$8/sq ft installed, roughly double a standard acrylic job.

Height is the second multiplier. Single story is ladder work; two stories add 20–30%; three stories require scaffold at $300–$800 rental plus 50–70% more crew time.

Trim complexity is the third lever: fascia, soffits, window casings, shutters, and porch columns are all cut-in work, and a Victorian with layered trim runs 20–40% over a plain colonial of the same footprint.

Geography stacks on top of all of it. BLS OES data for painters (SOC 47-2141) puts the national median wage at $23.75/hr as of May 2024 — about $49,400 a year.

The spread is wide: 10th percentile at roughly $28,490 and the 90th above $62,770 — a 2.2× range from one end of the trade to the other.

That 2.2× wage spread lands almost directly on the installed price: roughly $1.50–$2.50/sq ft in Texas and the Midwest, $2.5–$5 in the Mid-Atlantic and Northeast, and $5.00–$8.00 in coastal California or New York City.

Converted to total installed labor: BLS OES 47-2141 supports $1.50–$3.00/sq ft in labor on exterior work nationally. Material adds $0.3–$0.65/sq ft depending on grade.

The $1.50–$3.00 range is the number to check every line item against — if a contractor's labor component comes in above $3.50, ask what's driving it.

The prep line item you should never let a contractor delete

Power washing is the cheapest insurance on the entire job. It runs about $200 as a line item, and skipping it is the most common reason a fresh exterior paint job fails within one or two seasons. Paint bonds to a surface, not to the chalk, pollen, and mildew film sitting on it.

When that bond fails you are not touching up — you are repainting, which is $3,000–$10,000 all over again.

Caulking is the second non-negotiable. Unsealed gaps at trim joints, window casings, and siding butt-ends let water behind the envelope. Rot remediation on one wall section runs $500–$5,000+ once sheathing is involved, and no amount of good paint prevents it.

Scraping is the third: painting over peeling material without taking it to bare wood guarantees the new coat peels with the old one underneath it, usually inside six months.

Weather is prep too. Below 50°F or above 90°F, the film does not form properly — the coating dries before it coalesces, and the fix is stripping and redoing.

A contractor who wants to paint your house in a January cold snap or an August heat dome is buying himself a callback and charging you for it twice.

Where your paint budget actually goes — and what the grade jump buys

Material is the minority of the bill but it sets the repaint interval. Consumer-shelf paint runs $30–$40 a gallon, contractor mid-tier $48–$58, and premium exterior lines $65–$75.

A 2,000 sq ft house is roughly 3,600 sq ft of paintable surface — about 25 gallons for two coats at 250–350 sq ft per gallon on siding — so that entire grade spread is $400–$700 in materials.

Less than one extra day of crew time, and it buys three to five extra years of service life.

Coating prices have not held still. The BLS producer price index for paint and coatings manufacturing sits near 196 on its most recent monthly reading against a December 2012 base of 100.

Wholesale coating costs have run roughly 96% above the 2012 baseline — which is why material now lands at $0.3–$0.65/sq ft rather than the sub-$0.30 it once did.

Spread over the repaint cycle, premium costs less per year of service than builder grade does — the $700 you save on paint buys a repaint three to five years early.

Gulf Coast and Pacific Northwest humidity puts you on a 6–8 year cycle regardless of grade, with an annual walk-around to catch failures early.

Repaint cycles by grade in a moderate climate: premium acrylic 10–12 years, mid-tier 7–9, builder-grade 5–7. Subtract two to three years in the sun belt.

Four things in a painting quote that mean you should get another bid

"We have leftover paint from another job." Refuse it. That paint is either expired, mis-tinted, or degraded from a season in a truck bed. You are being sold disposal as a discount.

A price handed to you without a walkthrough. Nobody can price surface condition from the curb. A quote written on the spot is a placeholder that becomes a change order once the scraper comes out.

A deposit above 40%. Industry norm is 10–30% to cover material. Anything larger transfers your entire risk to a contractor you have not worked with.

A scope that just says "two coats." Two coats of what, on what? Get it in writing whether trim, soffits, fascia, garage doors, and the front door are included, and whether primer is being counted as coat one. If primer counts as a coat, you are getting one coat of finish paint at a two-coat price.

Ask for the certificate of insurance before work starts, not after. If an uninsured worker falls off a ladder on your property, your homeowner's policy is what pays, and a serious fall is a six-figure medical claim.

Write the spec yourself and the bids become comparable

The reason three bids come back $4,000 apart is usually that all three are pricing different jobs. Hand every painter the same written scope and the numbers collapse into a real range you can judge. Specify:

  • Paint: brand, product line, sheen, and color code — e.g. "Sherwin-Williams Duration Exterior Satin, Extra White SW 7006." Not "premium paint."
  • Coats: two coats of topcoat after primer. Primer is not coat one.
  • Prep: power wash, scraping, and caulking each named as included or excluded.
  • Surfaces: body, trim, soffits, fascia, garage doors, front door — list every one you expect painted.
  • Touch-up: leftover sealed cans with the color formula label stay with you.
  • Payment: 10–30% deposit, balance on completion of a joint walkthrough.

On a $5,000+ job, getting three bids against one written spec typically saves 20–40%. Timing helps too: November through February pricing runs 5–15% below peak, and late April–May or mid-September–October gives you good weather with crews still hungry to fill the schedule.

Should you paint it yourself, or is that a $6,000 mistake?

Labor is 70–80% of the bill, so DIY genuinely removes most of the cost. Materials alone for a 1,500 sq ft exterior run $600–$1,500 including paint, primer, caulk, brushes, rollers, drop cloths, and a sprayer rental.

Against a $4,000–$5,000 contractor quote, that is real money — roughly $3,000–$4,000 saved, for something like 60–100 hours of your own weekends.

The break-even is not the painting. It's the prep. Every DIY exterior job that fails in two or three years failed because the homeowner power-washed lightly, scraped the obvious flakes, and skipped priming bare wood.

Do that and you spend $1,000 in materials to buy a repaint on a five-year-early schedule — a net loss against just hiring it out once and getting ten years.

DIY makes sense when: the house is single story, the siding is intact with no widespread peeling, the trim is simple, and you'll actually do the full prep sequence (wash, scrape to bare, spot-prime, caulk every gap, then two topcoats).

Hire it out when: the house is two or more stories. Ladder work at that height is how people end up in emergency rooms, and scaffold rental erases the savings. Also hire out complex trim, failing surfaces, or tight weather deadlines.

Anything over roughly 2,500 sq ft of paintable surface on a two-story is contractor territory.

After the paint job: what to do before the crew leaves

Walk every elevation in daylight before signing off. Look for holidays (missed spots), drips at window casings, and whether trim received the specified coats.

Keep the sealed leftover cans with the color formula label — touch-up in year 3–4 costs $200 versus a full repaint.

Mark your calendar for an annual walk-around. Catching a lifting seam at the trim joint in year 8 is a $150 caulk-and-touch-up, not a $6,000 repaint. Southern and western exposures fail first.

Data sources: labor ranges derived from BLS OES 47-2141 (May 2024). Material pricing from BLS PPI PCU325510325510 (Paint and Coatings Manufacturing). Project ranges are editorial estimates; reviewed annually.

Frequently Asked Questions

How much does it cost to paint a 2,000 square foot house exterior?

Floor square footage is not the number painters price from — paintable surface is. A single-story home covers roughly 1.6–2.0× its footprint in wall and trim; a two-story runs 1.8–2.2×.

So the same "2,000 sq ft house" is 3,200–4,000 paintable on one story or 3,600–4,400 on two, and the two-story costs more per square foot on top of that because of height.

Practical ranges by house type: small ranch $2,500–$5,000; mid-size ranch or cape $3,500–$6,500; standard two-story colonial $5,000–$9,000; larger two-story $6,500–$12,000; Victorian or heavy-trim $8,000–$18,000.

Why is one painting quote double another for the same house?

The second most common cause is paint grade. A quote using $32 a gallon shelf paint against one using a $70 a gallon premium exterior line differs by $400–$700 in materials on an average house.

Cheap paint covers worse and often needs an extra pass, so the labor assumptions behind the two quotes differ too.

The third is prep honesty. A painter who walked the house and saw failing paint on the south elevation prices the scraping. One who quoted from the driveway doesn't, and bills it later as a change order. The low bid is frequently the same job with the prep moved into the fine print.

How long should exterior paint last before I have to do this again?

Paint grade and climate set the ceiling, but prep sets whether you reach it.

A premium coating over an unwashed, unprimed surface fails in two seasons regardless of the warranty — exterior coating warranties routinely exclude surface-preparation failures.

Southern and western exposures fail first. If you're inspecting, start there: chalking that comes off on your hand, hairline cracking, or any lifting at trim joints means you're in the last two years of the cycle and should budget accordingly.

Do I really need to power wash before painting, or is that an upsell?

The wash needs 24–48 hours of dry time before a brush touches the house. A crew that washes in the morning and sprays in the afternoon is trapping moisture under the film — you see it as early peeling, and it is not covered under any warranty.

Most exterior coating warranties explicitly exclude prep-related failures. If a contractor offers to skip the wash to sharpen his price, he is removing the bond foundation and handing you the failure bill in year two.

What is a fair deposit for an exterior painting job?

On a $6,000 job, a $600–$1,800 deposit is normal and reasonable. Beyond that you're financing the contractor's other projects. Progress payments on larger jobs are fine — tied to milestones like "prep complete" or "first coat complete on all elevations," not to calendar dates.

Hold the final payment until you've walked every elevation with the painter, in daylight, and agreed on a punch list. Confirm you're keeping the sealed leftover cans with the color formula label on them; that's what makes a touch-up in year four match.

Is it cheaper to paint my house in the winter?

The better trade is the shoulder season. Late April through May, before the peak rush, and mid-September through October, after it, both give you workable weather with crews that still have schedule gaps to fill.

You'll get better attention and often better pricing than mid-summer, when every painter in your market is booked three weeks out and has no reason to negotiate.

In the sun belt, winter is the peak season and summer is the off-peak — the same logic inverts. Above 90°F the coating skins over before it coalesces, which fails the same way cold does.