Concrete Calculator
The national estimate is adjusted by your state's overall price level (BEA Regional Price Parities, 2022, U.S.=100). This is a cost-of-living proxy applied to the national concrete calculator price — not a per-state concrete calculator quote. Always get local quotes before buying.
Labor estimate loading…
Under half a yard, bags beat a delivery truck. Past that line, ready-mix concrete runs $129.89–$190.83 per cubic yard for material, with pour-and-finish labor adding $6–$12 per square foot. Use this concrete calculator to size your pour: a standard 12×10-foot patio at 4 inches needs 1.63 yards, putting the installed total at $930–$1,750. Short-load fees ($40–$150), mix strength ($15–$40/yd upgrade), and truck access create the biggest price swings.
Producer Price Index by Commodity: Metals and Metal Products: Fabricated Structural Metal Bar Joists and Concrete Reinforcing Bars
Bureau of Economic Analysis · Regional Price Parities 2024 · Update pending
Concrete Mix Type vs. Cost
Standard ready-mix grades for residential work. Price per cubic yard, national average.
| Mix Type | PSI | Cost/yd³ | Best For |
|---|---|---|---|
| Standard 3,000 PSI | 3,000 | $140–$165 | Patios, sidewalks, driveways |
| High-strength 4,000 PSI | 4,000 | $155–$185 | Foundations, footings, retaining walls |
| Fiber-reinforced | 3,500 | $160–$195 | Crack-resistant slabs, driveways |
| Stamped/decorative | 4,000 | $175–$220 | Decorative patios; requires sealer every 2–3 years |
Before You Call the Batch Plant
- Ready-mix runs $129.89–$190.83 per yard; bags cost $258–$371 per equivalent yard in material alone, roughly double.
- Orders under 4-5 yards trigger a short-load fee of $40–$150 that can double your effective per-yard cost on small pours.
- A 12×10 patio at 4 inches installed: $932–$1,751. A 20×20 driveway at 5 inches: $3,282–$6,096.
- 10% overage (ACI 304R standard) is the minimum buffer. Running short mid-pour creates a cold joint, a permanent structural weak point.
- Full cure takes 28 days. Parking on a slab before day 7 risks cracking that only a full replacement fixes.
What a Yard of Ready-Mix Costs Right Now
Prices below come from the BLS Producer Price Index for Ready-Mix Concrete and the PPI for Prepackaged Concrete Mixes, updated monthly. These track what producers charge, not what you'll pay at the truck.
Your delivered price adds the supplier's margin, fuel surcharge, and any short-load penalty. Labor rates reflect BLS wage data for cement masons and concrete finishers.
| Material | Unit | Price Range |
|---|---|---|
| Ready-mix concrete (4,000 PSI) | per cubic yard | $129.89–$190.83 |
| 80 lb bag concrete | per bag | $5.74–$8.25 |
| 60 lb bag concrete | per bag | $4.68–$7.17 |
| Pour and finish labor | per sq ft | $6–$12 |
This concrete calculator sizes your pour and prices the material. It doesn't include excavation ($1–$5 per sq ft), gravel base ($0.80–$1.50 per sq ft), forms, reinforcement, or permits ($50–$400).
For irregular shapes, stepped footings, or commercial work, get a site-specific quote from your batch plant. Some calculators break concrete into cement, sand, and aggregate quantities; that matters for raw-material mixing, not for ready-mix or bagged concrete.
Material and Labor for Five Common Pours
The math on paper: length × width × depth in feet, divided by 27, plus 10% (ACI 304R standard). For a 12×10-foot patio at 4 inches: 12 × 10 × 0.333 = 39.96 cubic feet ÷ 27 = 1.48 yards, plus 10% overage (ACI 304R standard) = 1.63 yards (standard ACI 304R allowance). Material at $129.89–$190.83 per yard comes to $212–$311. Labor adds $6–$12 per square foot.
On 120 square feet that's $720–$1,440, putting the installed total at $932–$1,751.
The calculator above handles this math; the table below shows what it produces for common projects.
| Project | Size | Depth | Yards (+10% ACI waste) | Material | Installed |
|---|---|---|---|---|---|
| Small patio | 10×10 ft | 4 in | 1.36 | $177–$260 | $777–$1,460 |
| Standard patio | 12×10 ft | 4 in | 1.63 | $212–$311 | $932–$1,751 |
| Walkway | 4×30 ft | 4 in | 1.63 | $212–$311 | $932–$1,751 |
| Single-car driveway | 20×10 ft | 6 in | 4.07 | $529–$777 | $1,729–$3,177 |
| Two-car driveway | 20×20 ft | 5 in | 6.79 | $882–$1,296 | $3,282–$6,096 |
| Garage floor | 24×24 ft | 4 in | 7.81 | $1,014–$1,490 | $4,470–$8,402 |
A real pour, priced out: A homeowner in Phoenix scheduling a 20×20-foot driveway pour in early October orders 7 yards of 4,000 PSI from a local batch plant. Material: $909–$1,336.
The crew quotes $8 per square foot for grade, pour, and broom finish on a flat lot with direct chute access. That's $3,200 in labor, putting the job at $4,100–$4,500.
If this driveway needs to handle a loaded pickup or RV, set the thickness to 6 inches in the calculator above. Yardage jumps to 8.15, and material alone rises to $1,059–$1,555.
These totals are material plus labor. Starting from bare dirt adds site prep: excavation at $1–$5 per square foot plus 4-6 inches of compacted gravel at $0.80–$1.50 per square foot.
On a 400-square-foot driveway, that site prep runs $720–$2,600. Your next step: call three local batch plants for a delivered price per yard.
Short-Load Fees, PSI, and Four More Price Swings
Order size and short-load fees Batch plants set a truck minimum of 4-8 yards. Order less and you pay $40–$150 flat, or $15–$75 per yard on top of material.
On a 2-yard order with a $100 short-load fee, your effective cost per yard jumps by $50. Below half a yard, bags sidestep this entirely.
Mix strength Standard residential is 3,000 PSI. Driveways, garage floors, and slabs in freeze-thaw zones should be 4,000 PSI or higher. The upgrade runs $15–$40 per yard. On a 7-yard driveway pour, that's $105–$280 for a slab that won't crack under load in year three.
Finish treatment A broom finish falls within the standard $6–$12 per square foot labor rate. Stamped, stained, or exposed-aggregate finishes run $9–$30 per square foot installed. On a 400-square-foot driveway, that's $3,600–$12,000 for decorative versus $2,400–$4,800 for plain.
Region West Coast and Northeast metros run 20–40% above Midwest, per BEA Regional Price Parities and Southern prices. The same 7-yard pour that costs $909 in material in Phoenix could run $1,090–$1,270 in Seattle or Boston. Your batch plant quote is the final check on regional pricing.
Truck access If the truck can chute directly to your forms, there's no added cost. A fence, slope, or long run between the street and the pour site means a pump truck, which adds a separate line item to the job. Ask the batch plant about access before you order.
Timing Material prices track producer costs and don't swing much by season. Contractor labor runs 10–20% lower in shoulder months (USDA ERS seasonal contractor data) when crews aren't fully booked.
The cheapest pour window: October or March. Temperatures stay between 50–90°F (ACI 305R hot-weather concrete range), demand drops, and crews negotiate.
How a $3,000 Driveway Becomes a $7,000 Redo
Most concrete failures aren't bad luck. They're skipped steps that cost double because the only fix is demolition and repour.
Under-ordering by even half a yard The truck runs dry mid-pour. A cold joint forms where fresh concrete meets set concrete, creating a permanent crack line and structural weak point. Emergency short-load top-offs cost 2–3 times the normal rate (ACI 304R short-load fee guidance).
The 10% overage (ACI 304R standard) the calculator builds in exists for this reason. Leftover concrete is always cheaper than a cold joint.
Skipping the gravel base The base costs $0.80–$1.50 per square foot to do right. Skipping it is the number-one cause of driveway cracking and settling within 2-3 years.
The fix: demo at $1–$5 per square foot plus a full repour. On a 400-square-foot driveway, that's $320–$600 saved now versus a $2,800–$6,100 redo later.
Four inches under a truck A 4-inch slab handles patios and walkways. A loaded pickup or RV cracks it within two years. Driveways need 5-6 inches.
The extra depth on a 20×20 pour is about 2.7 yards, roughly $350–$520. Skipping it means a full tearout when the slab fails under load.
Finishing on bleed water Troweling before surface water evaporates traps moisture under the finish. The result: scaling, spalling, and delamination within the first winter. This is a crew error, not a material defect. Repair means grinding, an overlay, or full replacement.
No control joints Concrete cracks. Joints direct those cracks into straight, planned lines. Without them, cracks run random and diagonal across the slab.
Space joints 2-3 times the slab thickness in feet: 8-12 feet apart on a 4-inch slab. Cutting them during the pour costs almost nothing; random cracks afterward are permanent.
Driving on it too soon Concrete reaches about 70% of design strength (ACI 318) of design strength at 7 days (ACI 318), full design strength at 28. Parking a car at day 3 or a heavy truck at day 10 risks surface damage or structural cracking. There's no cosmetic fix for a cracked slab.
Pouring below 40°F without protection (ACI 306R cold-weather concrete threshold) Fresh concrete that freezes before curing won't reach design strength. It may look fine for months, then spall and crumble in the first freeze-thaw cycle. Heated blankets and hot water add cost to winter pours, but less than a slab that fails at 18 months.
Bags Beat the Truck Below Half a Yard
An 80-lb bag yields 0.6 cubic feet. One cubic yard is 27 cubic feet, so you need 45 bags to match a single yard from a truck.
At $5.74–$8.25 per bag, that's $258–$371 per yard in bags, roughly double the $129.89–$190.83 per yard for ready-mix. Bags win only when the truck's short-load fee ($40–$150 on orders under 4-5 yards) makes delivery more expensive than the bag premium.
That crossover sits around half a yard, about 22 bags of 80-lb mix. Below that, bags are cheaper and you control the pace; above it, a truck saves money and the crew finishes faster.
The 60-lb bags at $4.68–$7.17 each require 60 per yard, $281–$430 total. Easier on your back, but more expensive per yard. If you can handle 80 pounds, buy those.
When to pour it yourself and when to hire a crew
Concrete sets in 60-90 minutes. A small patio at 1-2 yards is doable for a homeowner with a helper. The savings: $932–$1,751 installed versus $212–$311 in DIY material. That's $720–$1,440 in labor you keep.
A 400-square-foot driveway is a different animal. You need to screed, float, edge, and broom-finish 7 yards before it kicks. That takes a 4-5 person crew working fast for 3-4 hours.
A homeowner team that falls behind ends up with trowel marks, low spots, or a pour that sets before finishing. On a 20×20 driveway, you have 45–60 minutes of workable time before the mix stiffens. Demo and repour doubles the cost.
If you're past 3-4 yards and haven't done it before, hire the crew. Budget $50–$90 per day for a mixer rental on bag routes past 10-15 bags.
Reading a Concrete Bid Against the Real Numbers
A contractor's installed price includes material, labor, overhead, and profit. Standard markup: 15–25% overhead plus 10–15% profit (ACI 305R contractor markup norms) on direct costs.
If the calculator shows $882–$1,296 material and $2,400–$4,800 labor for a 20×20 driveway ($3,282–$6,096 direct), a fair bid lands around $4,100–$8,530 after 25–40% combined markup (ACI 305R).
A bid well below that floor means something's being cut: thinner pour, lower PSI, skipped gravel base, or no reinforcement.
Every shortcut shows up as cracking and settling 1-3 years out, after the savings are spent.
Walk away if you see any of these:
- More than 30% deposit demanded upfront (industry norm is 10–30%, per CFPB contractor guidance).
- Cash-only pricing, which usually signals no insurance.
- No proof of license or insurance when asked.
- No written contract naming PSI, thickness, reinforcement type, and joint spacing.
- A bid well below every other quote with vague specs like "we use good concrete."
| Rate | Range | Unit | What drives the spread | Source | As of |
|---|---|---|---|---|---|
| Ready-mix concrete (4,000 PSI) | $129.89–$190.83 | $/yd³ | — | [1] | 2026-07-27 |
| 80 lb bag concrete | $5.74–$8.25 | $/bag | — | [3] | 2026-07-27 |
| 60 lb bag concrete | $4.68–$7.17 | $/bag | — | [3] | 2026-07-27 |
| Pour and finish laborHigh | $6.00–$12.00 | $/sq ft | Decomposed: wage × burden × crew ÷ output × markup | [2] | 2026-07 |
High / Med = labor cost decomposed from individually sourced factors (wage, burden, crew output, markup). See full methodology below.
Rates current as of 2026-07-27
Frequently Asked Questions
Do I need rebar, wire mesh, or fiber in a patio slab?
Reinforcement doesn't prevent cracks; it holds them tight. On a 4-inch patio over a compacted gravel base, fiber mesh blended into the concrete is the simplest option.
It adds little to the per-yard cost and the crew doesn't have to position anything during the pour.
Wire mesh does the same job but must be pulled into the middle of the slab during placement. If it sits flat on the ground, it does nothing.
Ask your crew how they support the mesh.
Driveways at 5-6 inches and any slab carrying regular vehicle weight benefit from #4 rebar on 18-inch centers or heavy welded wire. The material cost is modest relative to the pour; the real value is a slab that holds together under repeated loads instead of shifting at the cracks.
How long before I can park on a new driveway?
The 28-day number isn't arbitrary. Concrete reaches about 70% of design strength (ACI 318) of its design strength at 7 days, enough for a sedan. Full design strength arrives at 28 days, when it can handle a loaded pickup, RV, or trailer without risk.
Sealing has its own window. Wait at least 30 days so excess mix water evaporates from the slab. Sealing too early traps moisture and can cause the sealer to whiten or peel. After the first seal, plan to reseal every 2-5 years depending on traffic and climate.
Hairline cracks at control joints are normal and expected. Random diagonal cracks across the slab are not; they point to a base problem or insufficient thickness. Get those inspected before they widen.
My slab is cracking already. Did someone cut corners?
Concrete always cracks. Control joints exist to direct those cracks into straight lines at planned locations. If your cracks follow the joints, that's the system working as designed.
Diagonal cracks usually mean the base wasn't compacted or the pour was too thin. Surface scaling within the first winter points to a finishing defect.
White staining (efflorescence) is cosmetic, fades over time, and washes off with a mild acid rinse.
Spalling from deicing salt is separate. If you used rock salt on new concrete in its first winter, that's salt damage, not a contractor defect.
3,000 PSI or 4,000 PSI: when does the mix upgrade matter?
PSI measures compressive strength at 28 days. Standard residential is 3,000 PSI, which handles foot traffic and outdoor furniture without issue.
The upgrade matters for two reasons: vehicle loads and freeze-thaw durability. In cold climates, the denser mix resists the expansion cycles that cause surface scaling.
A driveway under daily pickup traffic stresses 3,000 PSI marginally.
The cost difference is $15–$40 per yard. On a 7-yard driveway pour, that's $105–$280 total, a small fraction of the job cost for a slab built to last 25-30 years instead of showing stress cracks early.
Do I need a permit to pour a concrete slab?
Permit rules vary by municipality, but the pattern is consistent: small utility pads and walkways under 200 sq ft usually skip the permit. Driveways, patios over 200 sq ft, garage slabs, and anything structural (footings, foundation walls, retaining walls over 4 ft) almost always require one.
Expect to pay $50–$500 for a residential concrete permit. The inspection typically checks subgrade compaction, rebar placement, and formwork before the pour. Skipping the permit risks a stop-work order, a tear-out, or problems when you sell the property and the title search flags unpermitted work.
Ready-mix concrete (standard 4,000 PSI): +0.1% vs last month · index updated June 2026